Results 1 to 6 of 6

Thread: A Way Around The Building Materials Issue

  1. #1
    New Member
    Join Date
    Aug 2016
    Location
    uk
    Posts
    26

    A Way Around The Building Materials Issue

    Ok, I know you cannot do a barn for building materials, but how about when we get the materials we can immediately give them to one of the tings we are building.
    It would mean that they would not hog storage space, and we could still wait around for four days for the final set of bricks to arrive as we do now, ore pay t cash to speed it up, but as with a real building, the materials would go gradualy to the place being built.
    how about it?

  2. #2
    Junior Member Axo's Avatar
    Join Date
    Feb 2018
    Posts
    47
    clever. Plus it would be motivating to see materials progress

  3. #3
    New Member
    Join Date
    Dec 2017
    Posts
    9
    I complitely agree with you, I support this ingenious idea.

  4. #4

    Possibility of individual assignment of building materials

    If assignment of building materials & tools, maybe its possible to assign individual items... Glass...nails etc to ALL buildings that need them... Community buildings & expansions included... But instead of being wiped out of ALL materials each time a building is completed you would be able to allocate & decide which building gets what materials

  5. #5
    New Member Nexus's Avatar
    Join Date
    Aug 2016
    Location
    Australia
    Posts
    16
    I actually agree with this.

  6. #6
    Junior Member Maggie Miller Williams's Avatar
    Join Date
    Dec 2017
    Location
    Atlanta, GA, USA
    Posts
    38
    Great idea!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •